CLH opens its new storage facility on the 2nd of December
11.18.2009 - NEWS
CLH (La Compañía Logística de Hidrocarburos ) is progressing with the construction works at its new storage facility at the port of Mahon in Menorca.

The company plans to relocate its current storage activities from the Cala Figuera facility built in 1957 to the new Mahon storage terminal. Once the new storage facility is completed, the Cala Figuera installation will be dismantled. The transfer of Cala Figuera facilites will improve the supply of petroleum products in Menorca.
Building of a new facility required a total investment of 22 million euro and almost two years of work. The new terminal includes 12 tanks with a of total 28.920 m3 built near the airport, a pumping station and a 5.3 km pipeline connecting the tanks with the port’s infrastracture.

ConocoPhillips Set to Sign Deal with Syria to Revive Gas Production, FT Reports
06.16.2026 - NEWS
June 16, 2026 [Reuters]- U.S. oil and gas producer ConocoPhillips is set ​to sign a contract wi... Read More
Stocks of Oil in US Strategic Petroleum Reserve Falls to Lowest Since 1983
06.16.2026 - NEWS
June 16, 2026 [Reuters]- Stocks of crude oil in the U.S. Strategic Petroleum Reserve fell to 340.... Read More
Angola's State Oil Firm Secures $2.65 Billion Financing from Foreign Lenders
06.16.2026 - NEWS
June 16, 2026 [Reuters]- Angola’s state oil company Sonangol has secured a $2.65 billion â€... Read More
India’s ONGC Considers Resuming Venezuela Oil Operations
06.16.2026 - NEWS
June 16, 2026 [Oil Price]- ONGC Videsh Ltd (OVL), the overseas unit of India’s state-owned Oil ... Read More